Install Solar Panels
Power your home from the roof, connected to the grid.
4
Steps, one application
AED 800
Total fees
~16 days
Est. completion
vs 33 days one by one
3
Documents, upload once
About this service
Rooftop solar connects your panels back to the grid through net metering. It spans a design, utility approval, installation and connection, sequenced here.
What happens, step by step
-
1
Design & Consultant
Approved Solar Contractor
An approved contractor prepares the system design for your roof.
-
2
Utility Approval
Dubai Electricity & Water Authority (DEWA)
DEWA reviews and approves the connection design.
-
3
Installation & Inspection
Approved Solar Contractor
Panels are installed and the system passes inspection.
-
4
Net-Metering Connection
Dubai Electricity & Water Authority (DEWA)
A smart meter is fitted and your system is connected.
Documents you'll need
-
Title Deed
Proof of property ownership -
Latest DEWA Bill
Most recent electricity and water bill -
Roof / Site Plan
Layout showing where panels will be installed